Skip navigation

Shortest Manufacturing Leadtimes on Large Size MLCC

large-size-mlcc-image

Johanson has the lowest manufacturing lead times on large size MLCC! We are currently quoting 10-14 weeks on chips, depending on product family desired.

Related

Johanson Dielectrics a Qualified Supplier to DLA Per Drawing 88011

Download Flyer [PDF] Johanson Dielectrics is proud to announce that we are officially listed as an approved and qualified supplier under Defense Logistics Agency (DLA) Drawing 88011, R...

Johanson Dielectrics officially qualified to DLA Drawing 88011 Rev G for high-performance switch-mode power supply capacitors.
Join Us at WEST 2026, San Diego CA

Visit Johanson Technology and Johanson Dielectrics at WEST 2026, the leading event for Naval, Defense, and Communications Technology.As an American-Owned Company, and North American Manufactur...

WEST 2026 Show | Johanson