Skip navigation

Shortest Manufacturing Leadtimes on Large Size MLCC

large-size-mlcc-image

Johanson has the lowest manufacturing lead times on large size MLCC! We are currently quoting 10-14 weeks on chips, depending on product family desired.

Related

Power Your Next Design with Johanson Dielectrics at APEC 2026

Johanson Dielectrics is exhibiting at APEC 2026, March 22–26 at San Antonio, TX. Visit us at Booth 316 to explore high-reliability ceramic capacitor solutions built for demanding power app...

01-APEC-2026_We'reExhibiting-391x2201-140res
Johanson Dielectrics a Qualified Supplier to DLA Per Drawing 88011

Download Flyer [PDF] Johanson Dielectrics is proud to announce that we are officially listed as an approved and qualified supplier under Defense Logistics Agency (DLA) Drawing 88011, R...

Johanson Dielectrics officially qualified to DLA Drawing 88011 Rev G for high-performance switch-mode power supply capacitors.